Horizon Project, Site-Phase 1
- F018 – Module interconnections in C and E pipe racks
- F035 – Removal and replacement of defective pipe in rack A
- F042 – Module interconnections in pipe rack A;
- F045 – Installation of heating cable and controls
- F046 – Preparation of hydrostatic pressure tests of pipes
- F047 – Installation and connections to the separator building
- C401511 – Module interconnections between fingers and tanks
- C401660 – Pipe fittings for the southeast tank farm
- Sulfur line and block
Duration/Year
2006-2008
Scope 90 M$
Scope 90 M$