Detour Lake Project
- Installation of a multi-plate tunnel
- Installation of 20 leaching tanks with agitators
- Installation of the primary crusher (60 × 113), four secondary crushers and all related equipment
- Installation of all external conveyors (72″ wide)
- Installation of 2 thickeners (65M dia)
- Installation of the detoxification area
Duration/Year
2011-2012
Scope 85 M$
Scope 85 M$