Canadian Malartic Mine, Quebec, Canada

Our client

Canadian Malartic Mine, Quebec, Canada

Osisko-Canadian Malartic


  • Manufacture of 4 Carbon-in-Pulp tanks (Kemix Pumpcell) (7 m x 11,3 m [DxH])
Duration/Year 2008-2009

Osisko Project


  • Installation of multi-plate tunnels
  • Installation of the primary crusher (60 × 89) and all related equipment
  • Installation of all external conveyors (60″ wide)
  • Installation of the recovery tunnel
  • Installation of 2 thickeners (Dia. 60 m)
  • Installation of the steel building (1300T)
  • More than 30 km of 25 kV power line
Duration/Year 2010-2011
Scope 45 M

Effluent treatment plant


  • Installation of 5 oxidation reactor tanks (7 m x 8.5 m [DxH])
Duration/Year 2014

Manufacture/installation of thickener riser


  • Design, fabrication and installation of the thickener riser (65 m x 2 m [DxH])
Duration/Year 2015

Malartic transfer tower & recovery well


  • 13 m × 12.5 m × 10 m (HxLxW) (20 tons of steel)
Duration/Year 2016